I just had granite countertops and a sink installed and a plumber came in to
put in the pipes under the sink. I had signed a contract with a kitchen place that estimated it would take the plumber 4 hrs. at 72.00/hr.,but it took him one hr. The kitchen guy said(when I signed the contract), that an adjustment would be made if it took less time. Today he said he had to add travel time for the plumber. My question is: is this a usual thing? I hope some kind person will share there knowledge with me on this. Thanks so much! Sis |
|
|||
|
|||
![]() "Sis" > wrote in message ... > I just had granite countertops and a sink installed and a plumber came in to > put in the pipes under the sink. I had signed a contract with a kitchen > place that estimated it would take the plumber 4 hrs. at 72.00/hr.,but it > took him one hr. The kitchen guy said(when I signed the contract), that an > adjustment would be made if it took less time. Today he said he had to add > travel time for the plumber. My question is: is this a usual thing? I hope > some kind person will share there knowledge with me on this. Thanks so much! > Sis Some trades people charge "portal-to-portal." Still, I think this is unusual unless you live in some remote area that would require an extended trip. Did they charge you for three hours travel time? What is the reasonable travel time from the plumber's place of business to your home? You can always call the plumber (of have someone else call) and ask if they charge by the job or by the hour and if they charge for travel time. You have learned a hard lesson as I have. Never accept a verbal promise. You can always make a handwritten notation on a contract, date it, and have all parties initial it. If they are true to their word they will have no problem with this. If you think you have been ripped off and haven't paid the balance of the bill, then pay for the hour that you actually received and ask for an itemized bill for the travel time. I would pay a reasonable amount for travel. You can always drive from your home to the plumber's shop at the same time of day that he did to estimate a reasonable travel time. If you have already paid then you are probably screwed. You could always file a claim in small claims court and try to get a judgment. This usually costs under $50. If the company you are suing is a corporation they will probably have to be represented by an attorney. You can always try to have the plumber subpoenaed to testify. The loss of time and inconvenience for the contractor and the plumber may be enough to settle the matter. |
|
|||
|
|||
![]()
Thanks so much for all the good advice, I really appreciate it so much. I
haven't made the final(second half) of my payment yet, and will try to get an adjustment on the bill from the kitchen place. Also, isn't it best to wait to make a final payment until all work is completed? The trim isn't installed yet for a new, larger window I had installed in my kitchen and the guy from the kitchen place said he will collect all the remainder that I owe except for that fee from me on Monday. Do you think I can tell them to wait until all the work on the contract is completed,since they may take longer to do it without that incentive? Thanks, again for your advice. Sis "Vox Humana" > wrote in message ... > > "Sis" > wrote in message > ... > > I just had granite countertops and a sink installed and a plumber came in > to > > put in the pipes under the sink. I had signed a contract with a kitchen > > place that estimated it would take the plumber 4 hrs. at 72.00/hr.,but it > > took him one hr. The kitchen guy said(when I signed the contract), that an > > adjustment would be made if it took less time. Today he said he had to add > > travel time for the plumber. My question is: is this a usual thing? I hope > > some kind person will share their knowledge with me on this. Thanks so > much! > > Sis > > Some trades people charge "portal-to-portal." Still, I think this is > unusual unless you live in some remote area that would require an extended > trip. Did they charge you for three hours travel time? What is the > reasonable travel time from the plumber's place of business to your home? > You can always call the plumber (of have someone else call) and ask if they > charge by the job or by the hour and if they charge for travel time. > > You have learned a hard lesson as I have. Never accept a verbal promise. > You can always make a handwritten notation on a contract, date it, and have > all parties initial it. If they are true to their word they will have no > problem with this. If you think you have been ripped off and haven't paid > the balance of the bill, then pay for the hour that you actually received > and ask for an itemized bill for the travel time. I would pay a reasonable > amount for travel. You can always drive from your home to the plumber's > shop at the same time of day that he did to estimate a reasonable travel > time. If you have already paid then you are probably screwed. You could > always file a claim in small claims court and try to get a judgment. This > usually costs under $50. If the company you are suing is a corporation they > will probably have to be represented by an attorney. You can always try to > have the plumber subpoenaed to testify. The loss of time and inconvenience > for the contractor and the plumber may be enough to settle the matter. > > |
|
|||
|
|||
![]()
Thanks so much for all the good advice, I really appreciate it so much. I
haven't made the final(second half) of my payment yet, and will try to get an adjustment on the bill from the kitchen place. Also, isn't it best to wait to make a final payment until all work is completed? The trim isn't installed yet for a new, larger window I had installed in my kitchen and the guy from the kitchen place said he will collect all the remainder that I owe except for that fee from me on Monday. Do you think I can tell them to wait until all the work on the contract is completed,since they may take longer to do it without that incentive? Thanks, again for your advice. Sis "Vox Humana" > wrote in message ... > > "Sis" > wrote in message > ... > > I just had granite countertops and a sink installed and a plumber came in > to > > put in the pipes under the sink. I had signed a contract with a kitchen > > place that estimated it would take the plumber 4 hrs. at 72.00/hr.,but it > > took him one hr. The kitchen guy said(when I signed the contract), that an > > adjustment would be made if it took less time. Today he said he had to add > > travel time for the plumber. My question is: is this a usual thing? I hope > > some kind person will share their knowledge with me on this. Thanks so > much! > > Sis > > Some trades people charge "portal-to-portal." Still, I think this is > unusual unless you live in some remote area that would require an extended > trip. Did they charge you for three hours travel time? What is the > reasonable travel time from the plumber's place of business to your home? > You can always call the plumber (of have someone else call) and ask if they > charge by the job or by the hour and if they charge for travel time. > > You have learned a hard lesson as I have. Never accept a verbal promise. > You can always make a handwritten notation on a contract, date it, and have > all parties initial it. If they are true to their word they will have no > problem with this. If you think you have been ripped off and haven't paid > the balance of the bill, then pay for the hour that you actually received > and ask for an itemized bill for the travel time. I would pay a reasonable > amount for travel. You can always drive from your home to the plumber's > shop at the same time of day that he did to estimate a reasonable travel > time. If you have already paid then you are probably screwed. You could > always file a claim in small claims court and try to get a judgment. This > usually costs under $50. If the company you are suing is a corporation they > will probably have to be represented by an attorney. You can always try to > have the plumber subpoenaed to testify. The loss of time and inconvenience > for the contractor and the plumber may be enough to settle the matter. > > |
|
|||
|
|||
![]() "Sis" > wrote in message ... > Thanks so much for all the good advice, I really appreciate it so much. I > haven't made the final(second half) of my payment yet, and will try to get > an adjustment on the bill from the kitchen place. Also, isn't it best to > wait to make a final payment until all work is completed? The trim isn't > installed yet for a new, larger window I had installed in my kitchen and the > guy from the kitchen place said he will collect all the remainder that I owe > except for that fee from me on Monday. Do you think I can tell them to wait > until all the work on the contract is completed,since they may take longer > to do it without that incentive? Thanks, again for your advice. Sis ABSOLUTELY DO NOT PAY THE FINAL INSTALLMENT UNTIL THE WORK IS DONE!. You already have issues and who knows what might happen with the rest of the work. I have two horror stories about similar situations. The first was a kitchen remodel that my mother had done by Lowe's. They required payment in full before the work started and she paid the entire thing by check. They took a reasonable amount of time to get all the cabinets and appliances in. The subcontractor who did the actual work was a rip-off artist. He came in with a couple of high school kids and tried to do a rush job. Things weren't installed properly and the wiring was done in a very sloppy and dangerous manner. He actually threw a bunch of expensive millwork into the trash heap and carted it away. When I brought this to his attention he said he didn't usually install the trim work! The stuff had to be ordered and the job dragged on partially finished for weeks. The faucet leaked and had to be replaced three times. The garbage disposal leaked. The exhaust system wasn't installed right. Some of the cabinet doors had to be replaced. They damaged the oven when they installed it. They screwed around with the flooring saying that they couldn't get the adhesive for the sheet vinyl. I called Armstrong who said that they had shipped the stuff weeks before. The nightmare just continued on and on, and I won't bore you with the details. The second situation was with my kitchen. I had a small kitchen fire and had to have some renovations. The people who came in to do the work turned out to be real hacks. They ruined as much as they fixed. Fortunately the insurance company made out the check in both my name and the contractor's name in the full amount of the services. They started a very minor renovation job the first of August and by mid October things had come to a halt. I refused to accept the horrendous job they had done and was demanding compensation for the things they had damaged. The contractor hadn't been paid a penny and threatened to sue me. I threatened to counter-sue and ask for punitive damages. The contractor decided to settle. We went to arbitration. I had a stack of documents because I learned my lesson from my mother's situation. I also had pictures and statements from contractors to back-up my figures for what it would take to finish the job and correct their damages. The contractor ended up taking a $4500 reduction in his fee. If it would have gone to court I am confident that I would have done better, but who needs that hassle. The bottom line is not to pay until the job is done and done right. The contractor my refuse to continue work and threaten you with legal action but you have to stick to your position. Any reasonable business person will want to do the job to your satisfaction. I think that business has become so bottom-line oriented that people will cut any corner possible to make an extra dollar. Most people don't want to "cause trouble" so they just allow themselves to be victimized. After a while, the contractor's standard of quality drops because people will accept inferior workmanship. At the same time, there are people who are honest and reputable who will do a good job. Sometimes when things go wrong you need to keep a cool head and insist on talking to someone who can help you. Often you have to work you way up the ladder to get help. Be persistent and have clear expectations. Tell them what you think is fair. Put you position in writing and ask them to do the same. |
|
|||
|
|||
![]() "Sis" > wrote in message ... > Thanks so much for all the good advice, I really appreciate it so much. I > haven't made the final(second half) of my payment yet, and will try to get > an adjustment on the bill from the kitchen place. Also, isn't it best to > wait to make a final payment until all work is completed? The trim isn't > installed yet for a new, larger window I had installed in my kitchen and the > guy from the kitchen place said he will collect all the remainder that I owe > except for that fee from me on Monday. Do you think I can tell them to wait > until all the work on the contract is completed,since they may take longer > to do it without that incentive? Thanks, again for your advice. Sis ABSOLUTELY DO NOT PAY THE FINAL INSTALLMENT UNTIL THE WORK IS DONE!. You already have issues and who knows what might happen with the rest of the work. I have two horror stories about similar situations. The first was a kitchen remodel that my mother had done by Lowe's. They required payment in full before the work started and she paid the entire thing by check. They took a reasonable amount of time to get all the cabinets and appliances in. The subcontractor who did the actual work was a rip-off artist. He came in with a couple of high school kids and tried to do a rush job. Things weren't installed properly and the wiring was done in a very sloppy and dangerous manner. He actually threw a bunch of expensive millwork into the trash heap and carted it away. When I brought this to his attention he said he didn't usually install the trim work! The stuff had to be ordered and the job dragged on partially finished for weeks. The faucet leaked and had to be replaced three times. The garbage disposal leaked. The exhaust system wasn't installed right. Some of the cabinet doors had to be replaced. They damaged the oven when they installed it. They screwed around with the flooring saying that they couldn't get the adhesive for the sheet vinyl. I called Armstrong who said that they had shipped the stuff weeks before. The nightmare just continued on and on, and I won't bore you with the details. The second situation was with my kitchen. I had a small kitchen fire and had to have some renovations. The people who came in to do the work turned out to be real hacks. They ruined as much as they fixed. Fortunately the insurance company made out the check in both my name and the contractor's name in the full amount of the services. They started a very minor renovation job the first of August and by mid October things had come to a halt. I refused to accept the horrendous job they had done and was demanding compensation for the things they had damaged. The contractor hadn't been paid a penny and threatened to sue me. I threatened to counter-sue and ask for punitive damages. The contractor decided to settle. We went to arbitration. I had a stack of documents because I learned my lesson from my mother's situation. I also had pictures and statements from contractors to back-up my figures for what it would take to finish the job and correct their damages. The contractor ended up taking a $4500 reduction in his fee. If it would have gone to court I am confident that I would have done better, but who needs that hassle. The bottom line is not to pay until the job is done and done right. The contractor my refuse to continue work and threaten you with legal action but you have to stick to your position. Any reasonable business person will want to do the job to your satisfaction. I think that business has become so bottom-line oriented that people will cut any corner possible to make an extra dollar. Most people don't want to "cause trouble" so they just allow themselves to be victimized. After a while, the contractor's standard of quality drops because people will accept inferior workmanship. At the same time, there are people who are honest and reputable who will do a good job. Sometimes when things go wrong you need to keep a cool head and insist on talking to someone who can help you. Often you have to work you way up the ladder to get help. Be persistent and have clear expectations. Tell them what you think is fair. Put you position in writing and ask them to do the same. |
|
|||
|
|||
![]()
Thanks again, you are so helpful in this stressful time. I will absolutely
not pay them tomorrow-until the work is complete. I was trying to be a "nice guy" but it didn't work. I want to think that people are honest and that you can trust their word, but I see that's not true many times. I'm glad your situation was resolved, now I have to get my courage up for tomorrow! Thanks. Sis PS I promise not to make a habit of writing to this group with questions like this, since they are kind of off -topic, and I apologize, but I thought since so many of us want nice kitchens, others may have had similar experiences. "Vox Humana" > wrote in message ... > > "Sis" > wrote in message > ... > > Thanks so much for all the good advice, I really appreciate it so much. I > > haven't made the final(second half) of my payment yet, and will try to get > > an adjustment on the bill from the kitchen place. Also, isn't it best to > > wait to make a final payment until all work is completed? The trim isn't > > installed yet for a new, larger window I had installed in my kitchen and > the > > guy from the kitchen place said he will collect all the remainder that I > owe > > except for that fee from me on Monday. Do you think I can tell them to > wait > > until all the work on the contract is completed,since they may take longer > > to do it without that incentive? Thanks, again for your advice. Sis > > > ABSOLUTELY DO NOT PAY THE FINAL INSTALLMENT UNTIL THE WORK IS DONE!. You > already have issues and who knows what might happen with the rest of the > work. I have two horror stories about similar situations. The first was a > kitchen remodel that my mother had done by Lowe's. They required payment in > full before the work started and she paid the entire thing by check. They > took a reasonable amount of time to get all the cabinets and appliances in. > The subcontractor who did the actual work was a rip-off artist. He came in > with a couple of high school kids and tried to do a rush job. Things > weren't installed properly and the wiring was done in a very sloppy and > dangerous manner. He actually threw a bunch of expensive millwork into the > trash heap and carted it away. When I brought this to his attention he said > he didn't usually install the trim work! The stuff had to be ordered and > the job dragged on partially finished for weeks. The faucet leaked and had > to be replaced three times. The garbage disposal leaked. The exhaust > system wasn't installed right. Some of the cabinet doors had to be > replaced. They damaged the oven when they installed it. They screwed around > with the flooring saying that they couldn't get the adhesive for the sheet > vinyl. I called Armstrong who said that they had shipped the stuff weeks > before. The nightmare just continued on and on, and I won't bore you with > the details. > > The second situation was with my kitchen. I had a small kitchen fire and > had to have some renovations. The people who came in to do the work turned > out to be real hacks. They ruined as much as they fixed. Fortunately the > insurance company made out the check in both my name and the contractor's > name in the full amount of the services. They started a very minor > renovation job the first of August and by mid October things had come to a > halt. I refused to accept the horrendous job they had done and was demanding > compensation for the things they had damaged. The contractor hadn't been > paid a penny and threatened to sue me. I threatened to counter-sue and ask > for punitive damages. The contractor decided to settle. We went to > arbitration. I had a stack of documents because I learned my lesson from my > mother's situation. I also had pictures and statements from contractors to > back-up my figures for what it would take to finish the job and correct > their damages. The contractor ended up taking a $4500 reduction in his fee. > If it would have gone to court I am confident that I would have done better, > but who needs that hassle. > > The bottom line is not to pay until the job is done and done right. The > contractor my refuse to continue work and threaten you with legal action but > you have to stick to your position. Any reasonable business person will > want to do the job to your satisfaction. I think that business has become > so bottom-line oriented that people will cut any corner possible to make an > extra dollar. Most people don't want to "cause trouble" so they just allow > themselves to be victimized. After a while, the contractor's standard of > quality drops because people will accept inferior workmanship. At the same > time, there are people who are honest and reputable who will do a good job. > Sometimes when things go wrong you need to keep a cool head and insist on > talking to someone who can help you. Often you have to work you way up the > ladder to get help. Be persistent and have clear expectations. Tell them > what you think is fair. Put you position in writing and ask them to do the > same. > > |
|
|||
|
|||
![]()
Thanks again, you are so helpful in this stressful time. I will absolutely
not pay them tomorrow-until the work is complete. I was trying to be a "nice guy" but it didn't work. I want to think that people are honest and that you can trust their word, but I see that's not true many times. I'm glad your situation was resolved, now I have to get my courage up for tomorrow! Thanks. Sis PS I promise not to make a habit of writing to this group with questions like this, since they are kind of off -topic, and I apologize, but I thought since so many of us want nice kitchens, others may have had similar experiences. "Vox Humana" > wrote in message ... > > "Sis" > wrote in message > ... > > Thanks so much for all the good advice, I really appreciate it so much. I > > haven't made the final(second half) of my payment yet, and will try to get > > an adjustment on the bill from the kitchen place. Also, isn't it best to > > wait to make a final payment until all work is completed? The trim isn't > > installed yet for a new, larger window I had installed in my kitchen and > the > > guy from the kitchen place said he will collect all the remainder that I > owe > > except for that fee from me on Monday. Do you think I can tell them to > wait > > until all the work on the contract is completed,since they may take longer > > to do it without that incentive? Thanks, again for your advice. Sis > > > ABSOLUTELY DO NOT PAY THE FINAL INSTALLMENT UNTIL THE WORK IS DONE!. You > already have issues and who knows what might happen with the rest of the > work. I have two horror stories about similar situations. The first was a > kitchen remodel that my mother had done by Lowe's. They required payment in > full before the work started and she paid the entire thing by check. They > took a reasonable amount of time to get all the cabinets and appliances in. > The subcontractor who did the actual work was a rip-off artist. He came in > with a couple of high school kids and tried to do a rush job. Things > weren't installed properly and the wiring was done in a very sloppy and > dangerous manner. He actually threw a bunch of expensive millwork into the > trash heap and carted it away. When I brought this to his attention he said > he didn't usually install the trim work! The stuff had to be ordered and > the job dragged on partially finished for weeks. The faucet leaked and had > to be replaced three times. The garbage disposal leaked. The exhaust > system wasn't installed right. Some of the cabinet doors had to be > replaced. They damaged the oven when they installed it. They screwed around > with the flooring saying that they couldn't get the adhesive for the sheet > vinyl. I called Armstrong who said that they had shipped the stuff weeks > before. The nightmare just continued on and on, and I won't bore you with > the details. > > The second situation was with my kitchen. I had a small kitchen fire and > had to have some renovations. The people who came in to do the work turned > out to be real hacks. They ruined as much as they fixed. Fortunately the > insurance company made out the check in both my name and the contractor's > name in the full amount of the services. They started a very minor > renovation job the first of August and by mid October things had come to a > halt. I refused to accept the horrendous job they had done and was demanding > compensation for the things they had damaged. The contractor hadn't been > paid a penny and threatened to sue me. I threatened to counter-sue and ask > for punitive damages. The contractor decided to settle. We went to > arbitration. I had a stack of documents because I learned my lesson from my > mother's situation. I also had pictures and statements from contractors to > back-up my figures for what it would take to finish the job and correct > their damages. The contractor ended up taking a $4500 reduction in his fee. > If it would have gone to court I am confident that I would have done better, > but who needs that hassle. > > The bottom line is not to pay until the job is done and done right. The > contractor my refuse to continue work and threaten you with legal action but > you have to stick to your position. Any reasonable business person will > want to do the job to your satisfaction. I think that business has become > so bottom-line oriented that people will cut any corner possible to make an > extra dollar. Most people don't want to "cause trouble" so they just allow > themselves to be victimized. After a while, the contractor's standard of > quality drops because people will accept inferior workmanship. At the same > time, there are people who are honest and reputable who will do a good job. > Sometimes when things go wrong you need to keep a cool head and insist on > talking to someone who can help you. Often you have to work you way up the > ladder to get help. Be persistent and have clear expectations. Tell them > what you think is fair. Put you position in writing and ask them to do the > same. > > |
|
|||
|
|||
![]() "Sis" > wrote in message ... > Thanks again, you are so helpful in this stressful time. I will absolutely > not pay them tomorrow-until the work is complete. I was trying to be a "nice > guy" but it didn't work. I want to think that people are honest and that you > can trust their word, but I see that's not true many times. I'm glad your > situation was resolved, now I have to get my courage up for tomorrow! > Thanks. Sis > PS I promise not to make a habit of writing to this group with questions > like this, since they are kind of off -topic, and I apologize, but I > thought since so many of us want nice kitchens, others may have had similar > experiences. I would just tell them that it was your understanding that the final payment was to be made when the job was COMPLETED. Therefore, you are surprised they would even ask for payment prematurely. I would also ask them to provide details on how they intend to charge for the ONE HOUR of plumbing services at the agreed upon hourly rate. You should go to one of the mapping websites like http://maps.yahoo.com/dd and put in your address and the plumber's address. It will generate a map with the mileage and the estimated driving time. When they start talking about travel time you will have something to discuss. (print out the map) For instance, if it takes 34 minutes to get from the plumber's shop to your house then you would multiply the hourly fee by 34/60 to arrive at a reasonable fee. No matter what they say, tell them that the maximum you will pay for the plumber is the one hour of services plus the travel time from his/her shop. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Quick and cheap kitchen redo | General Cooking | |||
More Kitchen Redo Questions - Refrigerator | General Cooking | |||
Kitchen Redo | General Cooking | |||
Kitchen ReDo-Floors | General Cooking | |||
Kitchen Appliances and general redo | General Cooking |